Gorakhpur Link Expressway closed On Tuesday, May 27, both lanes of the link expressway that was awaiting inauguration were shut down. Near Khanimpur, large dividers were erected across both lanes. Following the collapse of the Kushinagar four-lane and the closure of the connecting expressway for security inspections, the action was taken.

gorakhpurlinkexpressway 1748421610584

On Tuesday, the Kushinagar four-lane’s collapsed section was fixed. According to Jagran.com, the road was damaged here, gravel was removed, and asphalt was then installed after it was repaired once again.

The connection motorway is close to Kushinagar Four Lane. The Kushinagar four-lane road collapsed five days ago, five meters in length, five meters in breadth, and ten meters in depth, not far from the connecting highway. The hole was filled with dirt when the authorities learned about this. As soon as the issue was brought to the attention of the media on Tuesday, the sunken section of the road was repaired by clearing the dirt and gravel.

The connection expressway’s opening has been repeatedly delayed. It was originally scheduled for April’s inauguration. It was later determined that May would be the date of the inauguration.

To avoid rain-related damage to the connecting expressway, the route has been blocked.

Read more
Paresh Maity's Art Shines on the Cannes Red Carpet
Newspoint
Anup Jalota and Sonia Vaid Collaborate on New Ghazal 'Dosti Pyar Wafa'
Newspoint
Counting calories and yo-yo diets could increase risk of depression, say experts
Newspoint
New COVID strain discovered in UK as doctors warn of unusual symptoms
Newspoint
Full symptoms list of NB.1.8.1 strain of Covid which has been detected in the UK
Newspoint
Musk Slams Trump Tax Bill A 'Disgusting Abomination'
Abplive
Choose this perfect temple design, relaxed and reverence for your home: Mandir Design
Tezzbuzz
IPL Final: RCB won the trophy for the first time by defeating Punjab Kings, IPL champions became after 17 years
Tezzbuzz
LIC became the highest profitable government company, SBI left behind
Tezzbuzz
SSC Phase XIII (2025) Applications Open for Over 2000 Posts:
Tezzbuzz