Northeast Frontier Railway (NFR) has achieved a remarkable engineering milestone with the successful completion of girder launching on the iconic Bridge No. 164, popularly known as the Noney Bridge, in Manipur. The Noney Bridge, an engineering marvel, is considered as the world’s tallest Railway pier bridge of 141 meter that is an integral part of the 111 km long Jiribam - Imphal Railway line project.

The final span of the bridge was successfully erected recently, completing the launch of all eight spans of this monumental infrastructure project. This achievement marks a significant milestone in the construction of the bridge, which is not only an engineering marvel but also a vital link in the region’s transport network. What sets this bridge apart globally is its record-breaking piers—P3 and P4—each rising to an astounding height of 141 meters, making them the tallest bridge piers in the world. The bridge comprises a configuration comprising steel spans arranged as 1x71.5m + 5x106m + 1x71.5m + 1x30m. This strategic design ensures both structural stability and the ability to withstand challenging terrain and environmental conditions, reinforcing the bridge’s importance in enhancing regional connectivity and development.

Designed to withstand complex geological and climatic challenges of the region, the bridge spans difficult hilly terrain and deep valleys. The successful completion of its superstructure launching reflects the dedication, innovation and engineering excellence of the teams involved, working tirelessly in one of the most challenging environments in India. The successful completion of launching work was made possible through meticulous planning, cutting-edge construction techniques and the dedication of the entire NFR team

The Jiribam – Imphal new line railway project is one of the crucial connectivity projects for the North-eastern region. The section from Jiribam to Khongsang has already been commissioned in September 2022. Spanning over 55.36 km, the Jiribam – Khongsang section currently operates regular goods train services to Khongsang carrying essential commodities. As the project further advances, the Khongsang – Noney (18.25 km) and the Noney – Imphal (37.02 km) sections are scheduled to be commissioned in the coming years. Upon completion, the Jiribam – Imphal railway line will transform connectivity in Manipur, driving economic growth and regional development.

Read more
PM Kisan 20th installment: No more waiting! ₹ 2000 will come in the account on this day
Tezzbuzz
Is a 500 rupee note fake with this sign? Reserve Bank made shocking disclosure
Tezzbuzz
2025 Mahindra Bolero Neo seen during testing in India, 15 C will be launched
Tezzbuzz
Toilets In Petrol Pumps Only For Customers, Not Public: Kerala High Court
Tezzbuzz
Medical students protest bond policy, fee hike in Punjab
Khelja
Dhanush’s ‘Kuberaa’ faces price hike; Rs 75 increase in AP? Reports
Khelja
Oasis’ 10 most successful songs – Morning Glory misses out
Khelja
Excl: Karuna ‘I feel proud and grateful to live Pushpa’s story’
Khelja
Prosenjit Chatterjee supports Aamir Khan’s cinema-only release for ‘Sitaare Zameen Par’: Aamir can take risk
Khelja
Miley Cyrus says ‘ll be your shotgun rider for life’ after performing with Beyonce in Paris
Khelja