In a major update, the long-awaited “missing link” on the Mumbai-Pune Expressway is now on track for completion by December 2025. This critical infrastructure upgrade promises to slash travel time between the two cities by up to 25 minutes and reduce the overall distance by 13.3 kilometers.
Designed to streamline one of India's busiest expressways, the missing link is a marvel of modern engineering. It features an 840-metre viaduct, a 1.75-kilometre tunnel, and a dramatic 650-metre cable-stayed bridge soaring above the scenic Tiger Valley in the Lonavala-Khandala stretch . The route continues with an 8.9-kilometre tunnel that runs up to 170 feet beneath Lonavala Lake, creating a smoother, more direct path for commuters.
With the route expected to allow speeds of up to 120 km/h, the drive between Mumbai and Pune is poised to become not only faster but also more fuel-efficient and safer, with fewer sharp bends and challenging inclines. The project, being spearheaded by the Maharashtra State Road Development Corporation ( MSRDC ), has been under construction for several years and faced multiple delays.
Initially set to open in March 2024, the project saw its deadline pushed several times — to January, March, June, and August 2025. However, a recent statement from MSRDC officials, as reported by Mid-Day, indicates significant progress and a renewed target for completion by December 2025. Deputy Chief Minister Ajit Pawar has emphasized the project's importance in reducing traffic congestion and fuel consumption while enhancing travel efficiency on the busy corridor.


The project carries a hefty price tag of ₹6,600 crore and includes one of the most ambitious elements in India’s expressway network — a 45-storey-high cable-stayed bridge that is both an architectural and logistical challenge.
Once operational, the missing link is expected to dramatically improve road connectivity between Mumbai and Pune, benefiting not only daily commuters but also tourists and long-distance travelers. For those planning road trips between the two cities, this infrastructure boost could make the journey faster, smoother, and more scenic than ever before.

Read more
Stock market today: Trade setup for Nifty 50, global markets to Q1 results today; Eight stocks to buy or sell on Tuesday
Khelja
‘India need a new Virat Kohli, the old one is retired’: Nasser Hussain’s jibe after Gill’s men lose at Lord’s
Khelja
Jason McIntyre says Los Angeles Lakers would be West favorites if Bradley Beal joins
Khelja
Scott Boland becomes 10th Australian with a Test hat-trick: Stats
Khelja
Negligence Case Against Film Director After Stuntman Killed In Car Crash
Khelja
IND vs ENG 3rd Test: Ben Stokes reveals secret behind Jofra Archer’s match winning spell at Lord’s
Khelja
Bank Holiday Alert: Why Banks Will Remain Closed on Wednesday, 16 July 2025
India-employmentnews
Kisan Credit Card Scheme 2025: Get up to ₹5 Lakh Loan at Just 4% Interest – Here’s How
India-employmentnews
Income Tax Return 2025: Will Filing ITR Early Get You a Faster Refund? Here's the Reality
India-employmentnews
ITR Filing 2025: Now Pay Taxes Through 31 Banks – Check If Yours Is on the List
India-employmentnews