Redesigning the Controversial Overbridge

The railway overbridge located in the Aishbagh area of Bhopal, notorious for its sharp 90-degree turn, is set to be redesigned. This decision comes in response to significant public outcry on social media and safety issues raised by local residents.


Officials from the Public Works Department (PWD) have indicated that the redesign will be carried out in collaboration with the Indian Railways. The overbridge has recently become a target for memes and jokes online. "An official announcement regarding the redesign will be forthcoming," sources confirmed.


While the structure is not deemed structurally unsafe, its acute turn presents hazards for drivers. Situated in a densely populated part of the city, the bridge was intended to ease traffic flow and reduce delays at railway crossings, but its flawed design has resulted in accidents.


Numerous drivers have reported feeling uneasy and confused when navigating the turn, and experts warn that the design could lead to accidents, particularly in foggy conditions or at high speeds. In light of the escalating concerns, the railway department has sanctioned the redesign, which will include widening the bridge by three feet.


The new design proposal involves removing the current footpath and the central divider to enhance safety and practicality of the curves. These modifications aim to facilitate safer and smoother vehicle movement. PWD Minister Rakesh Singh has taken public feedback seriously and has tasked the National Highways Authority of India (NHAI) with investigating the matter.


The NHAI's report recommended that the speed limit on the bridge should not exceed 35 to 40 km/h, as high-speed driving on a road lacking proper slope or curvature increases the risk of accidents.


The administration has resolved to alter the bridge's shape without complete demolition. Additionally, accountability is being established for the engineering team responsible for the initial design, which failed to adhere to essential traffic standards, including appropriate turning radius, signaling systems, and visibility.


The situation surrounding the Aishbagh overbridge highlights the dangers of urban planning conducted in constrained spaces without adequate engineering considerations for public safety.


As reconstruction efforts commence, it is anticipated that the involved agencies will prioritize safety and quality over the speed of construction. Public awareness seems to be compelling authorities to take necessary actions.



Read more
UP Board Exam 2026: Fill the form for UP Board Exam 2026, see schedule and fees..
India-employmentnews
DU Admission 2025: Record applications received for admission in Delhi University, 2023 record broken
India-employmentnews
Reservation: Shock for EWS category people, now there will be no relaxation in age limit in these recruitment exams..
India-employmentnews
School Closed: Schools and colleges closed in this city from 16 to 23 July due to the Kanwar Yatra. administration took a big decision
India-employmentnews
UPSC CSE 2025 Mains Exam: UPSC Civil Services Mains exam from August 22, schedule released..
India-employmentnews
Bumper recruitment in BHEL, golden opportunity for 10th-12th pass; Salary up to 65 thousand
India-employmentnews
Home loan is going to be cheaper, RBI can cut the repo rate again; a Claim made in the report.
India-employmentnews
UPSSSC: PET 2025 exam will be held on 6-7 September, commission has released the time table..
India-employmentnews
UPSC CSE Mains Exam 2025: When will the UPSC Mains exam start? See full schedule and exam pattern here..
India-employmentnews
Ambedkar University Admission 2025: If you do not get admission in DU, then get admission in this university of Delhi, know which courses are taught..
India-employmentnews